Project Timeline
The EVARILOS project is expected to run 26 month. The following figure gives an overview of the time planning for the project, including the major milestones.
The project start is on November 1st, 2012.
The timeline for the Open Challenge is as follows:
-
Announcemnt: January 2014 (MS8)
-
Open challenge launched: April 2014 (MS9)
-
Results of the open challenge: October 2014 (MS11)
|
News:
Report on the results of the real-life experiments in the validation scenarios is available
Report on final results of interference robust localization is available
Final Version of the EVARILOS Benchmarking Handbook is available
Evaluation Opportunities ‐ Technical Annex Track 1
Track 2
Open Challenge ‐ Announcement of Winners
Join the EVARILOS mailing list
FIRE web site
FIRE - Brochure (2015)
Next events:
IPSN 2016
11‐14 April, 2016, Vienna
Net Futures 2015
20‐21 April, 2016, Brussels
ICC 2016
23‐27 May, 2016, Kuala Lumpur
IoT Week 2016
31 May‐2 June, 2016, Belgrade
EuCNC 2016
27‐30 June, 2016, Athens
IPIN 2016 4‐7 October, 2016, Madrid
EVARILOS Start: 1.11.2012
Project duration: 30 month
Contract Nr: 317989
EC Contribution: 1.379.944€
Participants: TUB, ADV, iMinds, SICS, THC
Project Fiche
|